Are rising energy costs a concern for your business? In Ireland, a significant shift towards sustainable solutions is offering a promising way to cut down on expenses. The Non-Domestic Microgen Grant Scheme provides a fantastic opportunity for businesses and organisations to adopt solar photovoltaic (PV) systems.
In this blog, we will guide you through everything you need to know about the scheme—from the financial benefits and eligibility criteria to the application process itself.
So, let’s see how simple it is to make a positive impact on the environment and transform sunlight into savings with this innovative programme.
What is the Non-Domestic Microgen Grant Scheme?
The Non-Domestic Microgen Grant Scheme is a pivotal initiative aimed at fostering the adoption of renewable energy in Irish businesses and organisations by providing financial support for solar PV installations.
This grant helps non-domestic entities reduce the initial costs of installing solar photovoltaic systems. By offering financial assistance, the scheme makes renewable energy more achievable and cost-effective for a broad array of organisations, encouraging a shift towards sustainable energy solutions.
Below, we explore the specifics of the scheme and who stands to benefit.
Benefits of the Microgen Grant Scheme
The Microgen Grant Scheme is not just about making green energy accessible; it also offers significant financial and environmental advantages. Below, we will look at how this scheme can help reduce costs and benefit the planet.
Financial Incentives Provided Under the Scheme
The scheme provides substantial financial support that can significantly lower the upfront costs of installing solar panels. By reducing these initial expenses, businesses and organisations can invest in solar energy without the burden of large initial outlays.
Environmental Benefits of Switching to Solar PV
Switching to solar power helps reduce your carbon footprint. Solar energy is clean and sustainable, helping to cut down on greenhouse gas emissions and reliance on fossil fuels.
Potential Savings and Return on Investment
Solar energy can reduce your electricity bills, leading to considerable savings over time. The return on investment can be quite attractive, as the savings on energy costs can eventually exceed the initial costs of installation.
What Grants Are Available for Solar PV System Size?
The Microgen Grant Scheme offers structured financial support based on the size of solar PV systems. This approach ensures a broad range of businesses can benefit from the initiative.
Here’s how grants are calculated based on system size and the significant impacts these grants have on facilitating solar installations.
Detailing Specific Grants for Various System Sizes
Below is a detailed table showing the grant values assigned to different solar PV system sizes:
Solar PV System | Grant Value |
1kWp* | €900 |
2kWp | €1,800 |
3kWp | €2,100 |
4kWp | €2,400 |
5kWp | €2,400 |
6kWp | €2,400 |
7kWp – 20kWp | €300/kWp |
21kWp – 200kWp | €200/kWp |
201kWp – 1000kWp (1MWp) | €150/kWp |
Variation in Grant Amounts Based on Size and Capacity
The grant amount increases with the system size, offering more support for larger installations to ensure the financial burden of such investments is mitigated. This structured financial assistance helps make solar energy a viable option for a wide range of applications.
Impact of Grant Amounts on Business Implementations
These grants significantly reduce the initial investment required for solar PV installations. For example, a small business installing a 3kWp system can benefit from a grant of €2,100, considerably lowering the barrier to entry for adopting renewable energy solutions. This financial support has enabled numerous businesses and organisations to reduce operational costs and contribute to environmental sustainability.
What is the Eligibility Criteria?
To maximise the benefits of the Microgen Grant Scheme, it’s crucial to understand who can apply and the specific requirements that must be met. We will outline the eligible entities, the necessary technical specifications, and any additional commitments required.
Who Can Apply for the Grant?
The scheme is available to various non-domestic entities such as businesses, agricultural groups, public bodies, and non-profit sectors. Eligible premises must have been constructed and occupied on or before December 31, 2020. This broad eligibility ensures diverse groups can use solar energy benefits.
Technical Specifications and Requirements
Applicants must ensure that the solar PV systems adhere to the SEAI’s standards, which include using approved equipment and installation practices. Furthermore, the installation must be intended for self-consumption with electricity demand, excluding setups meant only for exporting electricity to the grid.
Conditions and Commitments Required by Applicants
Key conditions include:
- Obtaining grant approval from SEAI before purchasing materials or starting installation.
- The grant offer is valid for eight months from the date of the grant offer notification.
- Submission of an ESB Networks NC5, NC6, NC7, or NC8 form for electricity connection applications.
- Use of a company and installer registered on the SEAI’s lists for Solar PV and Non-Domestic Microgen installations.
- All electrical works must be completed by an electrician registered with Safe Electric Ireland.
- A declaration of works must be signed by a registered installer.
- The scheme supports only new materials and products that have not been incentivized under any other grant scheme.
- Qualifying expenditures include materials and labour; however, if a company/installer is working on their own premises, only material costs qualify.
These detailed criteria ensure that the scheme supports compliant and efficient installations that meet both safety and performance standards, ultimately fostering a sustainable adoption of solar technology across eligible Irish entities.
What is the Application Process to Applying for Grants?
Applying for the Microgen Grant Scheme is straightforward, but it’s important to follow each step carefully to ensure your application is successful. Here’s a step-by-step guide, including what documents you need and the expected timeline for the review and approval process.
Step-by-Step Guide on How to Apply for the Grant
First, you must agree to a formal contract with your chosen company. This is crucial for documenting the agreement between you and the installer, which helps protect both parties and may prevent future disputes.
Necessary Documents and Information Required for the Application
Before you start the application process, ensure you have the following information at hand:
- MPRN – the Meter Point Reference Number, which is an 11-digit number found on your electricity bill.
- The year the building was constructed and first occupied (must be prior to 2021).
- The company you have chosen is registered with SEAI.
- Details about the solar PV system you plan to install.
- An email address for online application purposes.
- Your business identifier or any other relevant unique identifier.
Timeline for Application Review and Approval Process
Submit your application through the SEAI’s online Claims Portal. For complete details and to start your application, visit the SEAI website. After submission, the review process will begin, which typically takes a few weeks. You will be notified once your application is reviewed, whether it has been approved or requires additional information.
However, it would be better to get help from a professional consultant to get the new non-domestic microgen grant scheme for solar PV in Ireland to avoid rejections due to unqualifying criteria.
Conclusion
The Non-Domestic Microgen Grant Scheme offers a significant opportunity for businesses, educational institutions, and non-profit organisations in Ireland to transition to solar energy affordably.
By understanding the benefits, eligibility criteria, and application process outlined above, you can take confident steps towards sustainability and cost savings. If you need expert assistance with your solar PV installation, consider partnering with Roofer Dublin.
Our experienced team is ready to help you navigate the grant application process and ensure your installation meets all required standards. Contact Roofer Dublin today to begin your transition to solar energy!
FAQ’s
What is the Non-Domestic Microgen Grant Scheme for Solar PV in Ireland?
The Non-Domestic Microgen Grant Scheme is a government initiative designed to support businesses, public bodies, and non-profit sectors in Ireland with financial aid for installing solar photovoltaic systems to promote renewable energy adoption.
Who is eligible to apply for the Non-Domestic Microgen Grant Scheme?
Eligibility is open to all non-domestic entities, including businesses, agricultural entities, public bodies, and non-profit organisations, provided their premises were built and occupied before December 31, 2020.
What are the financial incentives available under the Microgen Grant Scheme?
The scheme offers varying grants based on the size of the solar PV installation, starting from €900 per kWp for systems up to 2 kWp and decreasing for larger installations, with a maximum support cap depending on the system’s capacity.
How do I apply for the Microgen Grant Scheme?
Applicants need to complete an online application via the SEAI Claims Portal, ensuring they have a formal contract with a registered company, and all necessary documents like the MPRN and details of the solar PV system planned for installation. For assistance with your application and to ensure all requirements are met, contact Roofer Dublin to apply for the Microgen Grant Scheme.
What are the technical requirements for solar PV systems under this grant scheme?
The installed solar PV systems must meet specific standards as defined in the Non-Domestic Microgen Scheme Code of Practice, including installation by registered professionals and use of approved materials and equipment.
Is there a deadline to apply for the Microgen Grant Scheme?
While there is no specified deadline for the scheme overall, once an applicant receives a grant offer, it remains valid for eight months from the date of issue. It’s important to begin the installation process within this period to secure the funding.